Skip to content

Carrswood Care Home

Appointed by 21 CBS Ltd, we delivered a full roof replacement at Carrswood Care Home, installing a new insulated roofing system complete with membrane gutters and aluminium perimeter detailing.
Aerial view of Carrswood Care Home large building with Euroclad Vieo roof surrounded by lush green trees. Two white vehicles are parked alongside in an asphalt lot.
Aerial view of Carrswood Care Home large building with Euroclad Vieo roof surrounded by lush green trees. Two white vehicles are parked alongside in an asphalt lot.
Aerial view of Carrswood Care Home large building with Euroclad Vieo roof surrounded by lush green trees. Two white vehicles are parked alongside in an asphalt lot.
Carrswood Care Home - details of new roofing system
Carrswood Care Home - details of new roofing system
Carrswood Care Home - details of new roofing system
Aerial view of Carrswood Care Home large building with Euroclad Vieo roof surrounded by lush green trees. Two white vehicles are parked alongside in an asphalt lot.Aerial view of Carrswood Care Home large building with Euroclad Vieo roof surrounded by lush green trees. Two white vehicles are parked alongside in an asphalt lot.Carrswood Care Home - details of new roofing systemCarrswood Care Home - details of new roofing systemCarrswood Care Home - details of new roofing system
Project: Carrswood Care Home
Project No. 0141
Twerton, Bath
2024-2025
Main Contractor: 21 CBS Ltd
Architect: SRA Architects

Project Scope & Objectives

Project 0141 at Carrswood Care Home ran from October 2024 to March 2025, delivered in partnership with 21 CBS Ltd as Main Contractor and SRA Architects as the appointed design team. Our scope involved the full replacement of the existing roof system to enhance performance, lifespan, and reliability of the building envelope.

Scope of Works

The works began with the removal of the existing standing seam zinc roofing, followed by installation of the Euroclad Vieo roof system. The new system was installed with a full build‑up incorporating Rokslab insulation to improve thermal performance and compliance with current standards. A new membrane gutter system was installed to optimise rainwater management, with all peripheral details completed using aluminium perimeter flashings for long‑term durability and a clean architectural finish.